ADA has worked on a variety of projects that include plumbing, pump stations, machine design, and energy related projects for industrial, residential and commercial facilities.
The firm has the capabilities to perform the following services:
Design of Pump Stations for Stormwater Drainage Systems
- Design of Rainwater Collection and Disposal Systems
- Design and Analysis of Fire Sprinkler Systems
- HVAC System Design
- Plumbing
- Lawn Irrigation
- Field Inspections
Projects
Harding Avenue (SR A1A) Pump Stations in the Town of Surfside:
ADA as part of the Florida Department of Transportation (FDOT) District 6 District-wide Drainage and Plans Review Consultant, is providing final design plans for two pump stations in the Town of Surfside. These pump stations will handle stormwater runoff from SR A1A and will discharge runoff into existing injection wells. These pump station contain large wet well chambers with two submersible pumps per station.
Miami Sr. High: New Chiller & Cooling Tower:
ADA provided the mechanical design for the new chiller and cooling tower. One of the project's phases included the connection of the new chiller and cooling tower to the school's existing Energy Management System (EMS). The design also included upgrades to the mechanical room and bringing it up to compliance with ASHRAE-15 (Refrigerant monitoring system, ventilation and breathing apparatus provided.
Truckwash 3A and 3B:
For the Miami-Dade County Department of Solid Waste Management (DSWM), ADA has designed and permitted two truckwash facilities. Both facilities have been designed to allow for manual and automatic washing of the DSWM trucks. Truckwash 3A is currently under construction. ADA has assisted DSWM by providing construction phase services. |