Contact_us Careers Intranet
Solid Waste

ADA has completed numerous solid waste projects. The projects have consisted of wetland mitigation, remining operations, Phase I environmental audits, and operation management services. The services provided by the firm include:

  • Planning
  • Design
  • Permitting
  • Construction Management
  • Operation Management

 

Projects 

Peerless Dade Recycling, Inc.:

ADA oversaw the expansion of the original Dade Recycling facility from a 10-acre site to the present facility that encompasses approximately 440 acres. Over the past 14 years, ADA has obtained permits for Construction and Demolition (C & D) Landfills, Material Reduction/Recycling Facility, Stormwater Management/Environmental Resource Permits, Wetlands Mitigation, Air Permit, and Septic Tanks for this operation. In addition, the firm has provided construction and operation management.

Miami-Dade County Department of Solid Waste Management:

Some of the projects performed for the Department include the replacement of the compactors at the Northeast Transfer Station, Design of Guardhouses and white goods areas at numerous trash and recycling centers throughout the county, a feasibility study to convert the Shredder Building at the South Dade Landfill into a transfer station and two truckwash facilities.

All Counties Transfer Station in Key Largo , Florida :

ADA obtained the transfer station permits, including the Environmental Resource Permit, for this C&D transfer station near sensitive mangrove areas. Also included was a building permit for the tipping slab and roof.